SCOPE OF SOLUTION:

  • Almost all the clogging or blockage happens between 2m above the flapper-gate and the coal feeding. When blockage never happens in all these areas then you can assume that the problem has been solved.
  • Two (2) m above the flapper-gate we will use bin-rotation anti-blocking product.
  • For the inner of the gate,  we use round architecture and avoid the dead angles of traditional design. We lower the height of gate to decrease the probability of blockage.
  • We lower the height between gate and coal-feeding; and install scrape knife-rotation product.
  • The "Bin-rotation product +special flapper-gate technology + scrape knife-rotation product", in addition with our exclusive control system will solve the blockage.
Coal Feeder Anti clogging Philippines DAtongjaya

Traditional Loose Device

Blockage Shape of Coal Bunker

Solution of Mix-borning with Brown Coal And Coal Sludge

Coal Feeder Anti clogging Philippines DAtongjaya

OUR SOLUTION


COAL FEEDER ANTI-CLOGGING SOLUTION provides a total countermeasure to this problem.  This solution is comprehensive because it will not only limited to solving normal blockage of coal bins but also solve the blockage cause by mixed-burning of very poor quality coal such as coal sludge.

Funnel

Shape


COAL FEEDER ANTI-CLOGGING SOLUTION

Coal-Fired Power Plant

Fireplace

Shape

Arch 

Shape

Coal Feeder Anti clogging Philippines DAtongjaya
Coal Feeder Anti clogging Philippines DAtongjaya

Present Situation of Coal Bin Blockage

PROBLEM: Coal-Fired Power Plant needs a solution to their coal build-up and blockage at their onsite coal-fired power generating station. The coal-fired storage bunker and discharge pockets were being used to collect scrapings from a coal/lime transfer belt system.  The discharge pockets may no longer flowing freely and needs a total solution that will clear this blockage.  This system is necessary to preserve safety of the operation. 

Bridge 

Shape